MEC began construction on this Financial District skyscaper in 2009, repairing the Plaza level due to excessive leaks and post 9/11 damages. Water testing was performed to determine the source of water infiltration and repair details were then determined. MEC also assisted with the investigation of water intrusion into the existing Con-Edison Vaults associated with the building.